    • Complete this stage:

    • If you are upgrading from an already built Proforge 2/2S Single Extruder setup.

    • Skip this stage and continue here:

    • If you are building the Dual Switching Extruder from the Proforge 2/2S build guides

  1. Remove the PTFE Tubing from the Hotend and Extruder. Cut the cable tie holding the cables to the carriage and remove the two M3 x 8mm bolts. Cut the cable tie holding the cables to the carriage and remove the two M3 x 8mm bolts.
    • Remove the PTFE Tubing from the Hotend and Extruder.

    • Cut the cable tie holding the cables to the carriage and remove the two M3 x 8mm bolts.

  2. Remove from the Hotend from the mount. Remove the fans from the mount. Remove the probe from the mount.
    • Remove from the Hotend from the mount.

    • Remove the fans from the mount.

    • Remove the probe from the mount.

  3. Remove all of the cable ties from the main branch of cables going down to the base.
    • Remove all of the cable ties from the main branch of cables going down to the base.

Finish Line

8 other people completed this guide.

Makertech 3D

Member since: 03/09/2018

43,445 Reputation

110 Guides authored

0 Comments

Add Comment

View Statistics:

Past 24 Hours: 0

Past 7 Days: 0

Past 30 Days: 0

All Time: 498