Skip to main content

Site Navigation

Your Account

Choose Language

Changes to Step #17

Edit by Makertech

Edit approved by Makertech

Before
After
Unchanged

Step Lines

[title] USB Port
[* blue] Fix the USB B cable to the back of the base with two M3 x 14mm bolts and M3 Nyloc Nuts6mm bolts.
[* greenorange] Route the cable along the side of the power supply.
[* red
] Connect the other sideend of the cable to the Control Boardcontrol board.
[* blue] Fix the USB B cable to the back of the base with two M3 x 14mm bolts and M3 Nyloc Nuts6mm bolts.
[* greenorange] Route the cable along the side of the power supply.
[* red
] Connect the other sideend of the cable to the Control Boardcontrol board.

Image 1

Old Version

New Version

Image 2

Old Version

New Version

Image 3

Old Version

New Version