Skip to main content

Site Navigation

Your Account

Choose Language

Help
Editing Step 11 —

Step Type:

Drag to rearrange

Install two NEMA 17 motors to the Base; orientate the cable ports towards the front of the base.

Fix the motor on the left of the 2040 beam with four M3 x 6mm button head bolts.

Fix the motor on the right of the 2040 beam with four M3 x 6mm cap head bolts and four M3 washers.

Your contributions are licensed under the open source Creative Commons license.