Pending Edits to Stage 03: Tool Carriage + Gantry
Step #3 edited: [Step edited]
Edited by mike crane (1)
(You don’t have enough reputation to patrol this edit.)
| [title] Eddy Probe | |
| [* 9] Before installing the Eddy probe check that the small switch on its back is set to USB mode. | |
| - | [* 10] Attach the cable to the Eddy probe and fix it to the back of the master plate. |
| - | [* 2] Eddy Probe ( |
| + | [* 10] Attach the supplied USB cable to the Eddy probe and fix it to the back of the master plate. |
| + | [* 2] Eddy Probe (using USB cable) |
| [* 5] M3 x 18 FH (Flat Head) |