-
-
Cut 70CM of the braided cable sleeving.
-
Use a lighter to melt the ends to prevent fraying.
-
-
-
Take two 1m motor cables.
-
Thread the sleaving over both of them.
-
Plug one of the cables into the extruder motor.
-
Cable tie that cable to the spool holder bracket.
-
Note, the second cable is there for the dual extrusion upgrade, it is installed now even if you don't have that upgrade.
-
-
-
Turn the lead screw to bring the gantry all of the way down, the hotend should be touching the print surface.
-
Cable tie both bunches of cables together to the gantry.
-
-
-
Cut 45CM of the braided cable sleeving.
-
Use a lighter to melt the ends to prevent fraying.
-
-
-
Raise the gantry to the very top.
-
Plug a 1M motor cable into the y-motor.
-
Slide the 45CM cable sleeving over the motor cable and Y-endstop.
-
Cable tie to the bottom of the gantry.
-