Changes to Step #19
Edit by Makertech 3D —
Edit approved by Makertech 3D
- Before
- After
- Unchanged
Step Lines
[title] Mounting the Power Port | |
+ | [* 10] Push all of the cables attached to the power port into the base. |
[* 10] Fix the power port to the rear of the base. | |
[* 5] M3 x 10mm Counter Sunk Bolt | |
[* 7] M3 Nyloc Nut | |
- | [* 11] Push all of the cables attached to the power port into the base. |