Skip to main content

Changes to Step #7

Edit by Makertech 3D

Edit approved by Makertech 3D

Before
After
Unchanged

Step Lines

[title] Hotend Wiring
+[* 9] If building with the Dual Switching Extruder upgrade this is Hotend #1 (on the left).
[* 5] Find the group of cables from the Hotend.
[* 4] Hotend Heater Cables
[* 6] Thermistor Cables
[* 3] Hotend Fan Cables
[* 4] Connect the Hotend heater cables to the ***HE0 ***terminal on the control board.
- [* 11] The +/- position of the cables is not important.
- [* 11] You may need to unscrew the board from its mounts to properly access it.
+ [* 11] The +/- position of the cables is not important. You may need to unscrew the board from its mounts to properly access it.
[* 6] Connect the Thermistor cables to the TH1 connector on the board.