Changes to Step #4
Edit by Makertech 3D —
Edit approved by Makertech 3D
- Before
- After
- Unchanged
Step Lines
+ | [title] Wrapping the Cables |
---|---|
+ | [* 2] Feed the sleeving onto both the Endstop and Motor cables. |
+ | [* 5] Cable ties the cables to the Z-Carriage bracket. |
+ | [* 3] Use a second cable tie to connect the cables form the gantry to the extruders cables. |
Image 1
No previous image
Added
Image 2
No previous image
Added
Image 3
No previous image
Added