Skip to main content
Editing Step 15 —

Step Type:

Drag to rearrange

Due to the paint that was applied on both the roof and top panel, the tabs may need filing down to get a proper fit.

Drop the roof into the slots on the top panel, push back to secure.

Before fixing the roof, the PTFE tubes need to be fed through the slots on the side as shown.

Your contributions are licensed under the open source Creative Commons license.