Skip to main content
Editing Step 27 —

Step Type:

Drag to rearrange

Take the 5m roll of GT2 belt and cut it in half.

Aim to get both halves as equal in length as possible.

Take an end of one of the belts and feed it in through the top right slit on the back of the carriage bracket.

It needs to be fed in from the inside of the bracket - you will need to temporarily remove the bracket from the linear rail carriage to gain better access.

Ensure that the belts teeth are facing out.

Fix the belt in place with an M4 x 6mm bolt and M4 penny washer.

Your contributions are licensed under the open source Creative Commons license.