Skip to main content
Editing Step 10 —

Step Type:

Drag to rearrange

A heated bed is required for this upgrade to properly work.

The heated bed needs to be raised 5mm before it can be installed. To do this we replace the 10mm stand-offs with 15mm ones.

With the 15mm stand-offs installed, re-mount the heated bed.

Your contributions are licensed under the open source Creative Commons license.